Waves and silt before berths
The berth plan is the last thing we draw. Exposure, wave penetration and where the mud will settle decide the basin shape, and they decide the running cost for the next forty years.
Marina planning and coastal engineering since 1991 · Bristol
Layouts, wave and siltation studies, breakwaters and pontoon systems for marinas from sixty to nine hundred berths. Fourteen engineers and planners, and the same one on your project from the first sketch to the last pile.
Selected projects
Nothing matches that search. to see everything.
Approach
The berth plan is the last thing we draw. Exposure, wave penetration and where the mud will settle decide the basin shape, and they decide the running cost for the next forty years.
We size the berths from enquiries the operator is actually turning away, not from a brochure. Most marinas we review have too many 10-metre berths and too few over 15.
A tighter layout that loses thirty berths can save a dredging campaign every other year. We put both numbers in front of the client and let them choose.
Replacing pontoons in a working marina is a logistics problem. We phase the work by winter and by pontoon so berth holders move once, if at all.
“They told us at the first meeting that our layout would silt up the inner basin within five years, and showed us the model. The redesign cost us thirty berths and we now dredge half as often.”
The office
The Tide Office, Hotwell Road
Bristol BS8 4UD
Hotwells · 10 min from Bristol Temple Meads
About this page
The business, the listings and the reviews are invented — this page exists to show what someone could put on marinadesigner.com. The domain itself is genuinely for sale.
Or speak to Colin Squire directly — +44 (0)7990 570292 · colinsquire@yachtingmatters.com